top of page

PROJECTS

Image by Waldemar

Fiera Foods

Optimization of Seismic Protection for Ammonia Pipeline Systems.

Image by diana kereselidze

Upper Crust

Optimization of Seismic Protection for Ammonia Pipeline Systems.

Image by Christian ter Maat

Avalanche Risk Forecast Code

The code of "avalanche risk forecast" was developed in Russia in 2000. No accident has taken place since then.

CONTACT US

Reach out to us to learn more about how we can assist in ensuring the seismic stability of your projects.
Email: zimin7@yandex.ru

CONNECT WITH US

© 2025 by 2554620 Ontario Ltd. All rights reserved.

bottom of page